Information
Quiz Description :
Name: Surveying mcq Practice Test – 3
Subject: Civil Engineering
Topic: Surveying
Questions: 23 Objective Type
Time Allowed: 15 Minutes
Important for: Civil Engineering Students for College / University exams, Govt Job / Private job interviews and GATE.
You have already completed the quiz before. Hence you can not start it again.
quiz is loading...
You must sign in or sign up to start the quiz.
You have to finish following quiz, to start this quiz:
You have Completed " Surveying mcq Practice Test - 3 "
0 of 23 questions answered correctly
Your time:
Time has elapsed
Your Final Score is : 0
You have attempted : 0
Number of Correct Questions : 0 and scored 0
Number of Incorrect Questions : 0 and Negative marks 0
Average score |
|
Your score |
|
-
Not categorized
You have attempted: 0
Number of Correct Questions: 0 and scored 0
Number of Incorrect Questions: 0 and Negative marks 0
-
It’s time to share this quiz with your friends on Facebook, Twitter, Google Plus, Whatsapp or LinkedIn…
Click on View Questions Button to check Correct and incorrect answers.
Login
Register
Forgot Password
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- Answered
- Review
-
Question 1 of 23
1. Question
1 pointsIf n observations are taken, the accidental errors are proportional to
Correct
Incorrect
Unattempted
-
Question 2 of 23
2. Question
1 pointsThe scale on which three dimensions can be measured, is known as
Correct
Incorrect
Unattempted
-
Question 3 of 23
3. Question
1 pointsAs per Indian Standard the total number of links in a 30-mether chain should be
Correct
Incorrect
Unattempted
-
Question 4 of 23
4. Question
1 pointsA scale which has a common representative fraction, but read in different measures, is called a
Correct
Incorrect
Unattempted
-
Question 5 of 23
5. Question
1 pointsThe error in measured length due to sag of chain or tape is known as
Correct
Incorrect
Unattempted
-
Question 6 of 23
6. Question
1 pointsWhen (h) is the difference in heights between the extremities of chain length (l) then the correction for slope required is:
Correct
Incorrect
Unattempted
-
Question 7 of 23
7. Question
1 pointsWhen the length of a chain along a slope of θ is (l), the correction for slop required is
Correct
Incorrect
Unattempted
-
Question 8 of 23
8. Question
1 pointsA triangle is said to be well conditioned if none of its angles is less than:
Correct
Incorrect
Unattempted
-
Question 9 of 23
9. Question
1 pointsThe longest chain line passing through the center of the area is known as
Correct
Incorrect
Unattempted
-
Question 10 of 23
10. Question
1 pointsThe tie line is run through the survey to
Correct
Incorrect
Unattempted
-
Question 11 of 23
11. Question
1 pointsThe permissible limits of error in chaining for measurement on rough or hilly ground is
Correct
Incorrect
Unattempted
-
Question 12 of 23
12. Question
1 pointsThe position of point can be fixed more accurately by
Correct
Incorrect
Unattempted
-
Question 13 of 23
13. Question
1 pointsThe base line is measured with
Correct
Incorrect
Unattempted
-
Question 14 of 23
14. Question
1 pointsInvar tapes are made of an alloy of
Correct
Incorrect
Unattempted
-
Question 15 of 23
15. Question
1 pointsMetallic tapes are made of
Correct
Incorrect
Unattempted
-
Question 16 of 23
16. Question
1 pointsFor accurate work, in comparison to chain, the steel band is used because it
Correct
Incorrect
Unattempted
-
Question 17 of 23
17. Question
1 pointsThe sag correction for chain line will be- When W is the weight of the chain, L is the span and P is the tension or pull.
Correct
Incorrect
Unattempted
-
Question 18 of 23
18. Question
1 pointsAn offset more than 15m in length is known as
Correct
Incorrect
Unattempted
-
Question 19 of 23
19. Question
1 pointsAn offset rod is provided at its top with:
Correct
Incorrect
Unattempted
-
Question 20 of 23
20. Question
1 pointsAn obstacle which obstructs both chaining and ranging may be
Correct
Incorrect
Unattempted
-
Question 21 of 23
21. Question
1 pointsAn obstacle which obstructs chaining but not ranging may be a:
Correct
Incorrect
Unattempted
-
Question 22 of 23
22. Question
1 pointsOn testing of a chain is found to be short, it can be adjusted by:
Correct
Incorrect
Unattempted
-
Question 23 of 23
23. Question
1 pointsIn order to locate a point by oblique offsets we must measure and note at least:
Correct
Incorrect
Unattempted